MDI Sequence for Flight SDW - 13 Nov 1995 11/23 16:30-18:00 1.1 Power up MDI to SLEEP mode, power up heaters and establish set points; 120 min dur step operation 20 X_EXP_PREP_ON Prepares SVM for MDI power on and turns off substitution heaters 15 M_PCONPRI Power prime converters on spacecraft bus A 5 M_DP_PATCH Patch DEP executable code 5 M_HTRON Turn on control electronics for Optics Package Heater (HOP) and Operational CCD Heater (HOC) 3 M_HOPSPT (64) Turn OPH2 on (01000000) 2 wait 2 minutes 3 M_HOPSPT (196) Turn OPH3 on (11000000) 2 wait 2 minutes 3 M_HOPSPT (255) Turn OPH1 on at full power (11111111). 2 wait 2 minutes 3 M_CCDSPT (4) Turn on Operational CCD Heater (HOC) at 15 watts 10 wait 10 minutes 3 M_CCDSPT (8) Set Operational CCD Heater (HOC) at zero watts and turn on Decontamination CCD Heater (HCM) at maximum set point (15 watts). 10 wait 10 minutes 3 M_CCDSPT (12) Set Operational CCD Heater (HOC) to 15 watts and leave CCD Decontamination heater on at 15 watts. 11/23 19:00-19:10 1.1a Thermal adjustments; 6 minutes To be performed if required 60 minutes after completion of block 1.1 +/- 10 minutes. dur step operation 3 M_HOPSPT (n) Adjust OP heater set point as required 3 M_CCDSPT (n) Adjust CCD heater set points as required 11/24 06:00-06:10 1.1a Thermal adjustments; 6 minutes To be performed if required 12 hours after completion of block 1.1 +/- 1 hour. dur step operation 3 M_HOPSPT (n) Adjust OP heater set point as required 3 M_CCDSPT (n) Adjust CCD heater set points as required 11/24 18:35-20:05 1.2 Power up Prime Oven Heater and establish set point; 10 min dur step operation 3 M_OVENON Prime Oven Heater (HPO) on 3 M_OVENSPT (2) Set prime oven at nominal set point 3 M_HOPSPT (n) Adjust OP heater set point as required 3 M_CCDSPT (n) Adjust CCD heater set points as required 11/26 15:30-19:30 2.1 Power up MDI from SLEEP to SAFE mode and perform initial checkout using VC2 telemetry; 158 minutes dur step operation Power on subsytems 5 K_IDTOMM Idle to VC2, verify status 15 M_IPON Image Processor on, verify VC2 in fill 5 M_CMON CCD Camera on, verify VC2 in fill after IP reset 5 K_MMTOID VC2 to Idle 5 M_MCHSON Internal mechanisms on 5 M_LTON Limb Tracker on wait 10 minutes Adjust heater set points 3 M_HOPSPT (n) Adjust OP heater set point as required 3 M_CCDSPT (n) Adjust CCD heater set points as required 3 M_OVENSPT (n) Adjust Oven heater set point as required 5 M_SQ_PATCH Patch DEP sequence code Perform initial checkout 15 M_MCHSCHK Checkout internal mechanisms 15 M_LTCHK Checkout limb tracker 5 M_DEPCHK Checkout DEP 5 M_OBSMODE Observing mode mechanism configuration (AIR) 5 K_IDTOMM Idle to VC2, verify FILL 10 M_TAP (4000) Take a picture set, 4 256x256 images, 4000 tick exposure time 15 M_PICT (4000) Take a picture set, 7 unique 1024x1024 images with 4000 tick exposure time 20 M_IPCHK Checkout IP, loads and dumps tables, checks IP memory 5 K_MMTOID VC2 to idle transition Adjust heater set points 3 M_HOPSPT (n) Adjust OP heater set point as required 3 M_CCDSPT (n) Adjust CCD heater set points as required 3 M_OVENSPT (n) Adjust Oven heater set point as required 11/27 16:10-18:10 2.2 Image Processor functional verification, NRT, TLM VC2 sub 2 doipchk.src total: 1378 doiptst.src, 8 veriptbl.src, 62 ip_test.src, 71 doalign.src, 6 align.src, 39 doaw.src, 3 ld_awbin.src, 488 aw.src, 25 docopycb.src, 1 copycb.src, 28 dofftst.src, 11 mk_ff.src, 54 doirbin.src, 3 ld_irbin.src, 266 irbin.src, 25 irpat.src, 86 dorblr.src, 7 ld_lrbin.src, 67 rblr.src, 33 dotwavg.src, 5 twavg.src, 22 dosclsum.src, 5 sclsum.src, 19 ip5kld.src, 33 ip5ktst.src, 10 12/01 17:25-19:55 2.3 Initiate DEP and IP loads, NRT Prime structure sequence and IP queue load, day_load.src total: 1434 DEP patches Flat Field Other IP Tables 12/02 17:10-18:10 2.4 Shutter performance test, NRT, VC2 initially shuttest.src, 200 12/03 TBD 1.3 Thermal adjustments; 6 minutes Set OP heater to maintain temperature of 20 +/-5 degC. To be performed on day 10 +/- 1 day. dur step operation 3 M_HOPSPT (n) Adjust OP heater set point as required 3 M_CCDSPT (n) Adjust CCD heater set points as required 12/03 TBD + 0:60 1.3a Thermal adjustments; 6 minutes To be performed if required 60 minutes after completion of block 1.3 +/- 10 minutes. dur step operation 3 M_HOPSPT (n) Adjust OP heater set point as required 3 M_CCDSPT (n) Adjust CCD heater set points as required 12/07 TBD 1.4 Thermal adjustments; 6 minutes Set CCD heater to maintain temperature of 0 +5/-0 degC. To be performed on day 14 +/- 1 day. dur step operation 3 M_HOPSPT (n) Adjust OP heater set point as required 3 M_CCDSPT (n) Adjust CCD heater set points as required 12/07 TBD + 60 1.4a Thermal adjustments; 6 minutes To be performed if required 60 minutes after completion of block 1.3 +/- 10 minutes. dur step operation 3 M_HOPSPT (n) Adjust OP heater set point as required 3 M_CCDSPT (n) Adjust CCD heater set points as required 12/16 13:00-15:00 2.5 Open front door and acquire first sunlight images, TSTOL, VC2 dur step operation 10 M_FDOPEN1 Open front door, MDI to STANDBY mode 15 M_PICT (4000) Take a picture set, 7 unique 1024x1024 images with 4000 tick exposure time 15 M_PICT (?) Take a picture set, 7 unique 1024x1024 images with modified exposure time 12/16 15:00-16:00 2.6 Internal Alignment, TSTOL, NRT, VC2 dur step operation 5 M_AMON Turn on alignment mechanism 30 alignit.src take alignment image and correct alignment 30 focus 20 focus images 10 tap_cont Initiate continuous image sequence to monitor CCD performance during cool down. 12/16 16:00-16:10 1.4 Thermal adjustments; 6 minutes Set CCD heater to maintain temperature of -70 +/-5 degC. To be performed after completion of door open/first light images dur step operation 3 M_HOPSPT (n) Adjust OP heater set point as required 3 M_CCDSPT (n) Adjust CCD heater set points as required 12/16 17:10-17:20 1.4a Thermal adjustments; 6 minutes To be performed if required 60 minutes after completion of block 1.3 +/- 10 minutes. dur step operation 3 M_HOPSPT (n) Adjust OP heater set point as required 3 M_CCDSPT (n) Adjust CCD heater set points as required 12/17 13:00-15:00 2.7 ISS and Michelson Tests dur step operation 40 alignit.src take alignment image and correct alignment 40 paw_motion 10 images to assess PAW induced displacement 20 mtm_tuning_I 52 images (4x4sum) of MTM detunes 12/18 13:00-17:00 2.8 Functional Tests in sunlight dur step operation 15 alignit.src take alignment image and correct alignment 15 ccd_perf_I 24 images (256 extract) of light transfer 60 flat_field_I 14 images with PZT offsets 60 mtm_tuning_II 12 images and 56 images (128 extract) of MTM detunes 90 observables_I 8 images of velocity and continuum observable components 12/20 13:00-19:00 2.9 Time series dur step operation 10 alignit.src take alignment image and correct alignment 290 dynamics dynamics time series