MDI Commissioning Phase Block 2
MDI Block 2 Commissioning Phase Test Sheet
Title: MDI Switch-on and Functional Tests
Objective: Power up to safe mode and verify MDI functionality
Outcome: MDI in Safe Mode, MDI functionally validated first with door closed,
then again with sunlight after opening the front door; bake-outs completed, CCD,
Optics Package and filter oven temperatures within limits.
Procedures:
- 2.1 Subsystem Switch-on and Initial Commissioning
- 2.2 Image Processor Functional Test
- doipchk - perform IP verification test suite
- 2.3 Table Loads
- 2.4 Shutter Tests
- 2.5 First Images with Sunlight
- 2.6 Internal Alignment
- m_amon - power up alignment mechanism
- 2.7 ISS & Michelson Tests
- 2.8 Functional Tests in Sunlight
- 2.9 Time Series