MDI As-Run Sequence for Flight SDW - 19 Dec 1995 Updated to reflect as-run period 12/1 to 12/18. All times are GMT. 12/01 00:34 (L-07:00) S/C powered up 12/02 08:08 Launch 12/03 02:10 Thermal reconfiguration of payload module initiated 12/03 13:11-14:40 1.1 Power up MDI to SLEEP mode, power up heaters and establish set points; 120 minutes dur step operation 20 X_EXP_PREP_ON Prepares SVM for MDI power on and turns off substitution heaters 15 M_PCONPRI Power prime converters on spacecraft bus A 5 M_DP_PATCH Patch DEP executable code 5 M_HTRON Turn on control electronics for Optics Package Heater (HOP) and Operational CCD Heater (HOC) 3 M_HOPSPT (64) Turn OPH2 on (01000000) 2 wait 2 minutes 3 M_HOPSPT (196) Turn OPH3 on (11000000) 2 wait 2 minutes 3 M_HOPSPT (255) Turn OPH1 on at full power (11111111). 2 wait 2 minutes, goal is to attain 30 +/-5 degC in optics package. 3 M_CCDSPT (4) Turn on Operational CCD Heater (HOC) at 15 watts 10 wait 10 minutes 3 M_CCDSPT (8) Set Operational CCD Heater (HOC) at zero watts and turn on Decontamination CCD Heater (HCM) at maximum set point (15 watts). 10 wait 10 minutes 3 M_CCDSPT (12) Set Operational CCD Heater (HOC) to 15 watts and leave CCD Decontamination heater on at 15 watts, trying to reach 35 +/-5 degC 12/04 01:20-02:00 MCC1 X burn 1 completed ESR at 02:04 12/04 17:00 MCC1 X burn 2 completed 12/05/95 10:00 End of continuous DSN coverage and Launch & Early Operations Phase (LEOP). Beginning of first LOS. 12/05/95 12:00 - 12/05/95 13:36 SOHO SHORT CONTACT 12/05/95 15:40 - 12/06/95 07:06 SOHO LONG CONTACT 12/05 16:30 1.2 Power up Prime Oven Heater and establish set point. dur step operation 3 M_OVENON Prime Oven Heater (HPO) on 3 M_OVENSPT (2) Set prime oven at nominal set point 3 M_CCDSPT (13) Adjust CCD heater set points to attain 35 degC 12/06/95 08:40 - 12/06/95 13:36 SOHO SHORT CONTACT 12/06/95 15:44 - 12/07/95 07:40 SOHO LONG CONTACT 12/07/95 08:40 - 12/07/95 13:36 SOHO SHORT CONTACT 12/07/95 15:45 - 12/08/95 07:35 SOHO LONG CONTACT 12/07 18:36-18:55 Enable prime oven monitoring as part of OCD 48 dur step operation 3 M_OVENMON Enable prime oven monitoring 12/08/95 08:40 - 12/08/95 13:36 SOHO SHORT CONTACT 12/08/95 15:44 - 12/09/95 07:25 SOHO LONG CONTACT 12/09/95 08:40 - 12/09/95 13:36 SOHO SHORT CONTACT 12/09/95 15:43 - 12/10/95 07:25 SOHO LONG CONTACT 12/10/95 08:26 - 12/10/95 13:37 SOHO SHORT CONTACT 12/10/95 17:00 - 12/11/95 07:06 SOHO LONG CONTACT 12/10/95 19:58 - 20:09 VC2 Telemetry Test, observed fill pattern 12/10 21:22 - 12/11 04:03 2.1 Power up MDI from SLEEP to SAFE mode and perform initial checkout using VC2 telemetry and running entire sequence under OCD 74. dur step operation Power on subsytems 5 K_IDTOMM Idle to VC2, verify status VC2 Telemetry, 21:19 - 22:32 15 M_IPON Image Processor on, verify VC2 in fill 5 M_CMON CCD Camera on, verify VC2 in fill after IP reset 5 K_MMTOIDLE VC2 to idle transition 5 M_MCHSON Internal mechanisms on 5 M_LTON Limb Tracker on 5 M_SQ_PATCH Patch DEP sequence code 5 M_DEPCHK Checkout DEP Pause for station handover, 22:33 to 23:25 GMT OCD 75 Re-enable IP macro queue 15 M_MCHSCHK Checkout internal mechanisms 15 M_LTCHK Checkout limb tracker 5 M_OBSMODE Observing mode mechanism configuration (AIR) 5 K_IDTOMM Idle to VC2, verify FILL VC2 Telemetry, 23:55 - 04:08 10 M_TAP (4000) Take a picture set, 4 256x256 images, 4000 tick exposure time - FAILED Pause to assess M_TAP problem with 4x4 bin, 12/11 01:05 - 01:33 OCD 77 Patch IP Macro images (HLRP) to use 4x4 bin list from page 14 OCD 75 Re-enable IP macro queue OCD 78 Reset IP, re-run OCD 77 and OCD 75 and then take a 256 extract image FIRST SUCCESSFUL IMAGES, 2:31 - 2:36 M_TAP (4000) Take a picture set, 4 256x256 images, 4000 tick exposure time - FAILED OCD 79 Dump macro queue, IP registers, reset IP 15 M_PICT (4000) Take a picture set, 7 unique 1024x1024 images with 4000 tick exposure time SUCCESS, 03:39 - 03:58 5 K_MMTOIDLE VC2 to idle transition Adjust heater set points 3 M_CCDSPT (12) Adjust CCD heater set points as required to maintain 35 +/-1 degC 12/11/95 08:40 - 12/11/95 15:20 SOHO SHORT CONTACT 12/11/95 18:40 - 12/12/95 07:06 SOHO LONG CONTACT 12/11 23:05 - 23:54 2.1 Complete abbreviated TSTOL checkout of IP dur step operation 5 K_IDTOMM Idle to VC2, verify FILL VC2 Telemetry, 23:07 - 05:52 OCD 87 Dump 4x4 bin list from IP memory (twice) 20 M_IPCHK Checkout IP, loads and dumps tables, checks IP memory. Skipped M_IP5KLD, M_IP5KTST, M_IPTSTLD, M_IPTEST. 12/11 00:50 - 12/13 02:36 2.2 Image Processor functional verification, NRT, TLM VC2 sub 2 doipchk.src doiptst.src veriptbl.src ip_test.src doalign.src align.src doaw.src ld_awbin.src aw.src docopycb.src copycb.src dofftst.src mk_ff.src doirbin.src ld_irbin.src Paused for CEPAC activity 12/12 03:41 - 03:58 Continued doipchk irbin.src irpat.src 12/12 04:19 - 05:00 Continued doipchk dorblr.src ld_lrbin.src rblr.src dotwavg.src twavg.src dosclsum.src sclsum.src ip5kld.src 12/12 05:46 - 05:48 Continued doipchk, partially successful ip5ktst.src 12/12 05:59 5 K_MMTOIDLE VC2 to idle transition 12/12/95 08:40 - 12/12/95 13:36 SOHO SHORT CONTACT 12/12/95 15:37 - 12/13/95 03:39 SOHO LONG CONTACT 12/12 23:41 - 23:50 2.2 Complete IP functional test, NRT dur step operation 5 ip5ktst.src 12/13/95 05:30 - 12/13/95 07:06 SOHO SHORT CONTACT 12/13/95 08:40 - 12/13/95 13:36 SOHO SHORT CONTACT 12/13/95 15:37 - 12/14/95 07:06 SOHO LONG CONTACT 12/14/95 08:40 - 13:36 SOHO SHORT CONTACT 12/14/95 15:35 - 12/15/95 07:06 SOHO LONG CONTACT 12/14/95 15:55 - 16:10 2.3 Attempt uplink of LOI tables as delayed command loads. Attempt fails after approximately 350 commands (last successful at 2000 4350). loi_7001_v001.src 12/15/95 06:09 - 06:16 2.3 Attempt uplink of LOI tables as delayed command loads. Attempt fails after approximately 350 commands (last successful at 2000 44d0). loi_7001_v001.src 12/15/95 08:22 - 12/15/95 10:17 SOHO SHORT CONTACT 12/15/95 09:15 - 09:47 2.3 Uplink LOI tables as delayed command loads MDI00006_001, loi_7001_v001.src MDI00007_001, loi_7003_v001.src 12/15/95 11:56 - 12/15/95 15:14 SOHO SHORT CONTACT 12/15 13:00 - 15:00 2.3 Initiate DEP and IP loads, NRT DEP patches, 13:00 - 13:11, DEP now at 10.0D IP Patch, 13:12 - 13:14 IP HLRP and DMPMEM Macro Loads, 13:30 - 13:33 IP table loads, 13:33 - 13:36 Test of 4x4 binning in IP, 13:36 - 13:38 Prime structure sequence and IP queue load using ldstr_noloi_v06.src Campaign sequence and IP queue load using ld_cam_ip_v07.src started at 14:48, suspended at 15:00 12/15/95 18:52 - 12/15/95 20:15 SOHO SHORT CONTACT 12/15/95 21:00 - 12/16/95 07:06 SOHO LONG CONTACT 12/16/95 15:31 - 12/17/95 07:36 SOHO LONG CONTACT 12/16 02:38 - 06:24 2.3 Resume campaign loads using ld_cam_ip_v07.src Campaign loads, 02:40 - 4:02 VC2 Telemetry, 03:22 - 06:34 DEP/IP Memory dumps, 4:21-4:30 Queue Dump, 4:40 Take a picture command with 4x4 binning worked correctly, 04:49 Load IP Registers, 4:56 - 05:00 Start structure program sequence with runstr_v03.src Reset IP, load registers, 05:47 - 05:57 Recover list page memory, 06:12 - 06:26 12/16 17:49 1.3.2 Thermal adjustments, TSTOL Set HOP heater to maintain temperature of 20 +0/-5 degC. To be performed at least 6 (TBR) days after transition to safe mode. The set point is anticpated to be 128 for the HOP. dur step operation 3 M_HOPSPT (128) Adjust OP heater set point as required 12/17 02:44 - 06:40, shared NRT 2.3.3 To correct any errors or omissions in block 2.3 activities Recover EDAC memories, 02:44 - 02:53 Reload HLRP and DMPMEM macros, 02:55 - 03:12 VC2 Telemetry, 03:22 - 06:34 Sequence start by q_runstr_v03.src Sequence start, Structure program, 06:24 - 06:39 Terminated sequenc with q_reset_v03.src 12/17/95 08:40 - 12/17/95 14:01 SOHO SHORT CONTACT 12/17/95 15:28 - 12/18/95 06:23 SOHO LONG CONTACT 12/17 20:26 - 20:42 2.3.4 To correct any errors or omissions in block 2.3 activities VC2 Telemetry, 19:46 - 20:22 VC3 Telemetry, 20:22 - Reset DEP / IP, 20:26 - 20:32 Sequence Start, 20:33 - 02:42 12/17 23:37 1.4.1 Thermal adjustments; NRT Set CCD heater to maintain temperature of 0 +/-5 degC. To be performed at least one day prior to first light. Set point selected is 8. This leaves the decontamination heater on but turns off the operational CCD heaters. MBHCMSPT 0, 23:37 12/17 23:42 Set DEP ESR flag (no Door Open) per OCD, 23:42 12/18 02:37 - 05:28 Dump DEP table, 02:37 Enabled Campaign mode (Magnetogram), 02:48 Disabled Campaign Mode, 03:18 K_MMTOMH, Switched to VC2 from VC3, 04:40 Set Campaign Address to 44 (mbsqreg 67 44), 04:55 Stop Sequence, 05:28 12/18/95 18:50 - 12/19/95 06:21 SOHO LONG CONTACT 12/19 02:28 - 05:21 Load IP registers, 02:28 VC2 Telemetry, 02:55 - >05:35? Sequence start 03:11 - 03:45 Sequence Testing 03:50 - 05:00 Sequence start 05:13 - 05:21 12/19/95 15:24 - 12/20/95 06:19 SOHO LONG CONTACT 12/19 17:33 - 18:21 2.5 Open front door and acquire first sunlight images, TSTOL, VC2 dur step operation 5 K_IDTOMM Idle to VC2 VC2 Telemetry, 17:33 - 18:21 10 M_FDOPEN1 Open front door, MDI to STANDBY mode, 17:37 15 M_PICT (600) Take a picture set, 7 unique 1024x1024 images with 600 tick (150 msec) exposure time M_PICT (2400) Single 1x image, totally saturated 5 M_FDOFF Door power off, 18:20
This page last reviewed and revised 19 December 1995 - SDW
Please address comments and questions to Scott Williams.