# Name: M_AMON # # Date: # # created: 09 05 1994 SDW # revisions: # # Change Description # # None # # MDI Author: Scott Williams 415-725-0482 # # Description # # This procedure powers up and initializes the MDI alignment mechanism # as part of M_ON ro M_WAKE. # # Intended Use # # Controlled initial power on of MDI AM subsystem # # Duration # # ? # # Requirements and Constraints # # MDI in SLEEP mode. Medium rate telemetry support required for # duration of power on sequence. MDI Operator on station to support # verification of procedure. # # Steps # # Step Description Command Monitor Value # 1 record MDI current, either MIPWA <2.0 # or MIPWB # 2 reset AM1 mbam1rs # 3 reset AM2 mbam2rs # 4 power on AM mbpwamon mkpwam "ON" # 5 record initial position mxam1pos # mkam1cmd # mxam2pos # mkam2cmd # 6 Moving alignment mechanism +/-2 steps M_AMRESET # to remove hystersis # 7 record MDI current, either MIPWA <2.0 # or MIPWB # 7 end of procedure