# Name: M_OVENON # # Date: # # created: 08 09 1994 SDW # revisions: # # Change Description # # None # # MDI Author: Scott Williams 415-725-0482 # # Description # # This Procedure powers up and initializes the Prime Oven heater controller. # # Intended Use # # Controlled initial power on of MDI primary optics oven heater controller # following initial power up to SLEEP mode # # Duration # # ? # # Requirements and Constraints # # MDI in SLEEP mode. Medium rate telemetry support required for # duration of power on sequence. MDI Operator on station to support # verification of procedure. MDI operator verification required for # each step before continuing. This procedure should be completed # as soon as possible following MDI power on. # # Steps # # Step Description Command Monitor Value # 1 switch on prime oven controller mbpwhpon mkpwhpo "ON" # 2 HPO set point to 2 (35 degC) mbhpospt mkhpospt 2 # tcblock mbhpospt 2 # 3 record MDI current, either MIPWA +0.4 # or MIPWB # 4 end of procedure