MDI Planned Sequence for Flight Operations SDW - 19 Dec 1995 Planned observing sequence for MDI based on SOHO daily schedule, 12/18/95. All times GMT. 12/20/95 15:22 - 12/21/95 00:58 SOHO LONG CONTACT 12/20 TBD 2:00 required 2.6 Internal Alignment, 10 minutes TSTOL, remainder as shared NRT, VC2 dur step operation 5 M_AMON Turn on alignment mechanism 30 alignit.src 30 focus 20 focus images 10 tap_cont Initiate continuous image sequence to monitor CCD performance during cool down. 12/20 TBD 2:00 required 2.7 ISS and Michelson Tests, shared NRT, VC2 dur step operation 40 alignit.src 40 paw_motion 10 images to assess PAW induced displacement 20 mtm_tuning_I 52 images (4x4sum) of MTM detunes 12/21/95 15:19 - 12/22/95 00:55 SOHO LONG CONTACT 12/21 TBD 4:00 required 2.8 Functional Tests in sunlight, shared NRT, VC2 dur step operation 15 alignit.src 15 ccd_perf_I 24 images (256 extract) of light transfer 60 flat_field_I 14 images with PZT offsets 60 mtm_tuning_II 12 images and 56 images (128 extract) of MTM detunes 90 observables_I 8 images of velocity and continuum observable components 12/22/95 15:17 - 12/23/95 00:53 SOHO LONG CONTACT 12/22 TBD 6:00 required 2.9 Time series, shared NRT, VC2 dur step operation 10 alignit.src 290 dynamics dynamics time series 12/23/95 15:17 - 12/24/95 00:53 SOHO LONG CONTACT 12/24/95 15:40 - 12/24/95 22:47 SOHO LONG CONTACT 12/25/95 No long contact, only short contacts and SSR dumps. 1/01/96 No long contact, only short contacts and SSR dumps. 1/04-1/7 Spacecraft reserved time for MCC2 / Orbit Shaping maneuver 1/8-2/13 Final Commissioning, MDI block 3 2/14-3/5 SVM Test, Joint Tests and Calibrations 3/6-29 PTCS Calibration, no experiment movements, experiments provide pointing 3/30-4/10 Halo Orbit Insertion 4/10-5/10 SOHO First Month of Science Operations 5/11-15 SVM Halo Orbit Tests - station keeping, medium term pointing stability tests (experiments provide pointing data).
This page last reviewed and revised 19 December 1995 - SDW
Please address comments and questions to Scott Williams.