Date: Sat, 22 Jun 1996 Subject: ocd for momentum management Change Required By: MDI/Craig Feinstein Title of Change: MDI Preps for momentum management Reason For Change: The following steps will take the necessary steps to prevent damage to MDI during the momentum management while minimizing the loss of data. Description of Change: In preparation for the momentum management: MDI Front Door to remain open Observing sequence continued Telemetry in "high rate" either VC2 or VC3 The following should be done as close to the actual momentum management as possible to minimize the impact on the 2 month continuous dynamics data. Conversations between the SOC and the FOT indicated that this could be done within 15 minutes of the momentum management or less. Notify MDI that the command is about to be sent. Send MDI block telecommand "MBLTOPNL" (Opens the ISS Loop) Verify mkltloop = Open Notify MDI that the ISS Loop has been opened After the momentum management: Again the following should be done as close after the end of momentum management as possible and the FOT has informed the SOC that it should be done within 15 minutes of the momentum mangement or less. Notify MDI that the command is about to be sent. MDI block telecommand "MBLTCLSL" (Closes the ISS Loop) Verify mkltloop = Closed Notify MDI that the ISS Loop has been closed