Date: 15 May 1996 Requested by: Joe Covington Title: VC2 During Long Contacts Reason: MDI needs additional VC2 for testing and fixing software problems from May 15 to the beginning of 2 month continuous run, May 24, if possible. Description: MDI requires the following pattern during the long contacts from May 15, 1996 to May 24, 1996 as possible before the continuous run: 1. NRT 2. When SSR dump finished, MDI would like ~30 minutes of VC2 3. Switch to VC3 for ~3 hours of NRT 4. THen after ~3 hours, switch to VC2 again for ~30 minutes